Main content
Penrith M6 opens 13 hours early
The West Coast Mainline railway bridge at Clifton was moved into place ahead of schedule. This once in a lifetime spectacle was watched by local people, who have suffered disruption as a consequence of the engineering works. Train services will resume on Thursday after the track is reinstated. Photo - Network Rail
Duration:
This clip is from
More clips from BBC RADIO CUMBRIA
![]()
Millom's Dingle under threat
Duration: 06:03
![]()
Carlisle City of Sanctuary
Duration: 03:47
![]()
Pouring Cumbria's milk down the drain
Duration: 07:36
![]()
Cumbria's pothole red alert
Duration: 07:41





