Main content

Penrith M6 opens 13 hours early

The West Coast Mainline railway bridge at Clifton was moved into place ahead of schedule. This once in a lifetime spectacle was watched by local people, who have suffered disruption as a consequence of the engineering works. Train services will resume on Thursday after the track is reinstated. Photo - Network Rail

Release date:

Duration:

9 minutes

This clip is from