Sand dunes protecting the Cambrian railway line are strengthened
The 4.5m long plastic piles are 'vibrated' into the ground with this machine
The plastic sheet piles will be cased in wood when the work is finished
One of the flood gates on the Afon Erch has already been replaced - work has to be timed around the tide